Highwood Circle Drainage Rehabilitation Project

This project is in response to a catastrophic failure of this system during the 2015 "Thousand Year Flood" where pipe collapse resulted in a 20' sink hole.  This project will replace some segments of pipe and slip line others.  It was put out for bid in mid 2022 but got no responses.  It will be re-bid in early 2023.  Stantec is the engineer for this and will do the construction management.