Highwood Circle Drainage Rehabilitation Project - COMPLETE
This project is in response to a catastrophic failure of this system during the 2015 "Thousand Year Flood" where pipe collapse resulted in a 20' sink hole. This project replaced some segments of pipe and slip lined others.